OV-G-I

Modified on Tue, 10 Oct 2023 at 01:24 PM


1. Check how often the error happens. If only one or two times a day, then it’s caused by the unstable Grid. If error is continuous then refer below mentioned steps.


2.  Discharge inverter for 30min. If the inverter backs to work normally, then let it go.


3.  If installation is new then please check connectivity is proper or not of AC gland make sure AC cable connect properly in connector terminal only. (The polarity is clearly mentioned on AC gland).


4.  Please check all the wire connections from AC connectors to the AC distribution box and in meter side also (were there any untighten connections, or wire contact area is too small).


5.  If suspecting loose contact please properly connect the cable after disconnect from connector or ACDB.


6.  Overcurrent protection of the grid may cause the over current problem of short circuit on the AC side.


7.  You could check if there is a short circuit on the AC side first.


8.  Check current flow by clamp meter in Phase, neutral and earthing. Because due to shorting we have also found current flow in neutral and earthing cable.


9.  If issue still persist then, Please check the VOC of all of the PV strings (Voltage should check from connector end after disconnect string from inverter).


10. Use a multi-meter to check the voltages between PV+ and earth, PV- and earth of all the PV strings. It should be decreasing from values between 5% and 95% of single PV module Voc. If voltage stuck on above single module VOC or in decreasing condition if voltage getting increase that means there is some fault with that strings.


11.  If system is three phase (Check AC side voltage Phase to Phase, phase to neutral and neutral to earthing.) Always check reading from inverter AC gland end.


12.  If system is single phase (Check AC side voltage Phase to neutral, phase to earthing and neutral to earthing.) Always check reading from inverter AC gland end.


13.  Take complete reading of information menu like DC1, DC2, DC3, DC4 then VA, VB, VC or VGrid then Status (Error) and Total energy.


14.  Take reading from advance info Alarm messages, version, running messages, warning messages.


15.  Take ACDB, DCDB close and clear photo, inverter serial no. which is stick on inverter body and inverter complete installation photo.


Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select atleast one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article