Setting up a BYD LVS

Modified on Wed, 09 Jun 2021 at 12:37 PM

BYD LVS 4.0

Ensure BYD LVS is updated to latest firmware

Ensure the inverter is updated to HMI 33 and DSP 22  

1.  Make sure the BYD is commissioned exactly how the manual shows.

2.  Ensure you shut the inverter off first

3.  Turn on and commission BYD battery

4.  Turn on inverter and select Battery B-Box.

5.  Verify communication is good between Inverter and Battery

6.  Verify BMS Voltage and inverter measured voltage in the Hybrid display